Friday, January 11, 2013

Our Dreamy Bathroom

There have been a lot of changes this week so I thought I would share with you before we go for our weekend visit. I'm most excited about the master bathroom this week.  They have almost finished our master bathroom and I think they are done with our guest bathrooms.  

Here is a picture of the master tub and tile around the tub.
 A close picture of the shower.  We are still waiting for them to install the glass.
Here is a picture from a distance.  I am in love with this bathroom!
I can't remember if I mentioned that they got the kitchen sink in last week.  They are now in the process of getting the hardware for the sink installed.  They had installed the soap dispenser when Chris was there one day this week but no faucet yet.
 Here is the master bathroom sinks.  The guest bathroom down stairs sinks look exactly the same.
 This is the bathroom sink upstairs.
 Toilet and Shower upstairs.
 They installed the hard wood stairs this week.  Here is the view from the top.
 And the view from the bottom. (don't mind the dirt on the white. .. they will be cleaning that up)
This is a closer picture of the granite and cabinets.  We will pop off that piece of granite in the back and put in a back splash after we move in.

They installed all of our closet systems this week as well as patched holes and repainted the walls.

Chris and I started packing up the apartment last weekend.  We will continue to back this weekend as well.  The walk through is one week from Monday so they are running out of time to get everything done.  Luckily they don't have much left to do.  (shower glass, screen and door for porch, stair railing, installation of remaining appliances, kitchen faucet, and last minute cleaning.)  We have 16 more full days to wait but we are keeping ourselves very busy in that time.

Until Sunday . . .